November 2012 Project of the Month

Posted on

Project Picture of the Month – November 2012

November’s winner is a 20′ x 38′ in-plant office on top of a 20′ x 40′ powder-coated mezzanine in Tucson, AZ. This project was sold through Marty Kelber of Modular Systems Group and was installed in about two weeks.
Special features of this building include: full glass doors, IBC stairs and landing, as well as soundboard insulation integrated into the sub-flooring to eliminate noise from the shop underneath.
Thanks to Marty for sending us a great picture of another successful in-plant office by Panel Built, Inc. He will receive $25 for his efforts.
If you have some great pictures of a recent project by Panel Built, send your digital image to info@panelbuilt.com for your chance to win!
*Pictures become the property of Panel Built, Inc. and may be used in future marketing endeavors.
About these ads

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s